Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the Hai Trung Furniture Showroom and Model House Center

Aerial photo, World Steel project archive.

Vietnam

Hai Trung Furniture Showroom and Model House Center Structural steel for a multi-storey & civil building in Vietnam

A multi-storey civil building in Vietnam, World Steel's home market (2022). A showroom with display floors, comparable to US furniture, appliance and home-center retail buildings.

Location
Vietnam
Building type
Multi-storey & civil building
Year
2022
Next step Plan a similar building →

Project overview

About Hai Trung Furniture Showroom and Model House Center

Hai Trung Furniture Showroom and Model House Center is a multi-story building in Vietnam completed in 2022, with a steel structure designed, fabricated and supplied by World Steel. Showrooms generally ask the frame to stay out of the way: open display floors, broad glazing toward the street and room to rearrange exhibits without columns in the wrong place.

US furniture retailers, kitchen and bath dealers, car dealerships and homebuilder design centers share those goals. We design steel frames for open display floors to AISC 360 within IBC 2024 and ASCE 7-22, coordinate with your architect through IFC and deliver erection drawings for your contractor. Send floor plans and elevations to discuss a steel layout.

Showrooms with model rooms need clear floors that can be rearranged as displays change, which favors long-span steel floor beams over many interior columns. US furniture and home-design showrooms often have the same brief, and the floor live load is set for retail use under ASCE 7.

In context

Hai Trung Furniture Showroom and Model House Center by the numbers

In the portfolio

Hai Trung Furniture Showroom and Model House Center is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Hai Trung Furniture Showroom and Model House Center in 2022, together with 12 other projects shown here from that year.

More multi-storey and civil buildings:

Design points

What a multi-storey & civil building needs from its steel

General points for every multi-storey & civil building, not specific to this one.

Stacked tolerances

Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.

Learn more →

Risk category matters

Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.

Learn more →

Fire-resistance ratings

Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.

Planning a multi-storey & civil building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.