Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long factory building framed with red tapered portal frames and roof purlins

World Steel job in Vietnam (Tay Ninh Province): tapered portal frames.

Ho Chi Minh City, Vietnam

Le Tran Factory Structural steel for a factory in Vietnam

A factory building in Ho Chi Minh City, Vietnam (2019). A factory for a domestic manufacturer, typical of the light-industrial plants US owners build to bring production closer to home.

Location
Ho Chi Minh City, Vietnam
Building type
Factory
Year
2019
Next step Plan a similar building →

Project overview

About Le Tran Factory

Le Tran Factory is a 2019 industrial steel building in Ho Chi Minh City. World Steel carried the structure from engineering through fabrication and supply, the same scope it offers on export projects.

A small or mid-size US plant, such as a fabrication shop, food packer or parts maker, follows a similar path. Your architect or Engineer of Record sets the code basis, typically IBC 2024 with ASCE 7-22 loads, and we propose value-engineering options for their approval. The steel then ships in containers or breakbulk to a US port. Share your plans to begin.

Le Tran Factory in Ho Chi Minh City, supplied in 2019. Small and mid-size factories make up much of World Steel's home market work, and the same design and quality steps apply to them as to its largest projects.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Le Tran Factory by the numbers

In the portfolio

Le Tran Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Le Tran Factory in 2019, together with 19 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.