- Location
- Philippines
- Building type
- Multi-storey & civil building
- Year
- 2023
- Status
- Proposed
Project overview
About Proposed 3 Storey Commercial Building
This 2023 proposal is a three-story commercial building in the Philippines, designed by World Steel in structural steel. It shows how the company approaches a mid-rise frame at the design stage, before any steel is cut.
In the US, three-story retail-over-office or mixed-use buildings are a common infill product. A steel frame suits these buildings because it leaves open floor plates that tenants can arrange. We take your architectural set, model the frame in SAP2000 to IBC 2024 and AISC 360 and return member sizes for your Engineer of Record to approve. Ask for a design study.
A proposed three-storey commercial building, designed by World Steel in steel. Low-rise commercial buildings like this are where steel framing competes directly with concrete in the US, and the comparison usually comes down to erection speed and foundation size.
This is a proposed project. Images show the design stage and the building may differ from what is finally built.
Gallery
Proposed 3 Storey Commercial Building images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Proposed 3 Storey Commercial Building by the numbers
In the portfolio
Proposed 3 Storey Commercial Building is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 8 projects listed for Philippines.
World Steel supplied Proposed 3 Storey Commercial Building in 2023, together with 21 other projects shown here from that year.
More multi-storey and civil buildings:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Philippines · 2023
3 Storey College of Medicine
Multi-storey & civil building
Photo
Vietnam · 2022
Hai Trung Furniture Showroom and Model House Center
Multi-storey & civil building
Photo
Ho Chi Minh City, Vietnam · 2020
The Sun Tower
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.