- Location
- Thailand
- Building type
- Aircraft hangar
- Year
- 2018
- Structural steel
- 200 t
Project overview
About Aircraft Hangar
World Steel designed, fabricated and supplied about 200 metric tons of structural steel for this aircraft hangar in Thailand, completed in 2018. Hangars are among the most demanding building types for a steel fabricator in general: the door opening drives the structure, the roof must clear the aircraft without interior columns, and door loads feed into the frame.
For a US airport, FBO, flight school or maintenance operator, the project shows hangar-scale tonnage handled by our engineering and fabrication teams. A US hangar is designed under IBC 2024 and ASCE 7-22, with door type and supports coordinated with the door manufacturer and your Engineer of Record. Share the aircraft you plan to house and the door size you need.
About 200 tonnes for an aircraft hangar reflects the long clear span and the large door opening, where the door header carries much of the roof. US hangars follow NFPA 409 for fire protection, which shapes the building before the steel is sized.
Gallery
Aircraft Hangar images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Aircraft Hangar by the numbers
Steel weight
About 200 metric tons of structural steel (220 short tons), about 8% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 13th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Aircraft Hangar is one of 1 aircraft hangars in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Aircraft Hangar in 2018, together with 5 other projects shown here from that year.
Design points
What an aircraft hangar needs from its steel
General points for every aircraft hangar, not specific to this one.
Clear span for the aircraft
The design aircraft sets the span and clear height, which makes the main rafters or trusses the heaviest pieces in the package.
Learn more →The door header
A bifold or hydraulic door spans most of one wall, so the header carries the door weight and its wind loads.
Learn more →Open-door pressures
With the door open, internal pressure adds to roof uplift, and the load path is followed down to the anchor rods.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Aircraft hangar. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2020
Winmax Export Project
Port facility
Photo
Tay Ninh Province, Vietnam · 2023
CFG Long An Bridge
Steel bridge · 196 t steel
Photo
Singapore · 2020
Steel Bridge
Steel bridge
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning an aircraft hangar in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.