Fabricated steel members for the Warehouse 20×36 & Warehouse 20×24, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Warehouse 20×36 & Warehouse 20×24 Structural steel for a warehouse in Thailand

A steel warehouse in Thailand, listed in World Steel's portfolio for 2024. Two buildings were supplied together under one order. Two buildings supplied as one package, as US contractors often order a main warehouse and an ancillary shed together.

Location
Thailand
Building type
Warehouse
Year
2024
Footprint
20 m × 36 m (66 ft × 118 ft) and 20 m × 24 m (66 ft × 79 ft) (two buildings) · about 1,200 m² (12,900 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About Warehouse 20×36 & Warehouse 20×24

Supplied to Thailand in 2024, this pair of warehouses shares a 20 m width, about 66 ft, with lengths of 36 m and 24 m, roughly 118 ft and 79 ft. Two buildings at one width are a practical choice for a US owner who wants to separate uses on the same site, such as storage in one building and a shop or packing area in the other.

Matched widths also suit phased construction. One building can go up now and a second, or an extension, later, using the same frame design with more or fewer bays. World Steel details these frames in Tekla Structures, which makes it simpler to match later additions to the original design. Share your site plan if you are thinking about growth in stages.

Both buildings share a 20 m span, so the frames can be identical and only the number of bays changes. For a US contractor, that means one set of shop drawings for the frame type and fewer different parts to sort on site.

In context

Warehouse 20×36 & Warehouse 20×24 by the numbers

Footprint

About 1,200 m² (12,920 sq ft) of footprint, about 22% of a US football field with end zones.

It is 20 m (66 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.

By footprint it ranks 20th of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 20×36 & Warehouse 20×24 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Warehouse 20×36 & Warehouse 20×24 in 2024, together with 16 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.