Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory

Aerial photo, World Steel project archive.

Vinh Long Province, Vietnam

Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory Structural steel for a factory in Vietnam

A factory building in Vinh Long Province, Vietnam, listed in World Steel's portfolio for 2024. Industrial frames like this are designed around the equipment inside them, not just the roof over it.

Location
Vinh Long Province, Vietnam
Building type
Factory
Year
2024
Next step Plan a similar building →

Project overview

About Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory

Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory in Vinh Long Province, Vietnam, was completed in 2024 with steel engineered, fabricated and supplied by World Steel. Feed plants generally combine tall process areas, ingredient and finished-feed storage, and loading zones, which leads to a steel layout with several building heights within one project.

US feed mills, grain operators and agricultural cooperatives deal with the same mix of process and storage space. We design these frames under IBC 2024 and ASCE 7-22, coordinate equipment supports with your process supplier and package steel by area so your erector can build one zone at a time. Send your mill layout and site location for an initial review.

Feed mills combine tall process towers for grinding and pelleting with storage halls for bagged and bulk feed. Process towers carry heavy equipment on several floors, so their frames are designed more like a multi-storey building than a shed.

In context

Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory by the numbers

In the portfolio

Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory in 2024, together with 16 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.