- Location
- Philippines
- Building type
- Warehouse
- Year
- 2024
- Status
- Proposed
Project overview
About Proposed Simon Warehouse Complex
The Proposed Simon Warehouse Complex is a 2024 World Steel design for a group of warehouse buildings in the Philippines. As a proposal, it shows the engineering stage of a project, where building sizes and framing options are worked out before fabrication.
US developers planning a multi-building logistics or storage campus benefit from that same early work. Standardizing frame spacing and member sizes across buildings is a general design point that can simplify fabrication and erection. We model each building, give your Engineer of Record options to approve and quote the buildings together or in phases. Share your site plan.
A warehouse complex with several buildings is usually designed with shared frame types, so the shop can fabricate in batches and the site can erect one building after another. US industrial parks built in phases follow the same approach.
This is a proposed project. Images show the design stage and the building may differ from what is finally built.
Gallery
Proposed Simon Warehouse Complex images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Proposed Simon Warehouse Complex by the numbers
In the portfolio
Proposed Simon Warehouse Complex is one of 63 warehouses in the World Steel portfolio on this site, and one of 8 projects listed for Philippines.
World Steel supplied Proposed Simon Warehouse Complex in 2024, together with 16 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Philippines · 2024
Honda Warehouse
Warehouse
Photo
Philippines · 2023
Philippines Warehouse 2023
Warehouse
Photo
Philippines · 2023
Vic Ong Warehouse
Warehouse · 220 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.