Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Warehouse 38×75, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Warehouse 38×75 Structural steel for a warehouse in Thailand

World Steel's 2023 steel warehouse in Thailand. The project name gives its plan size as 38 × 75. It is an example of the plain, repeatable warehouse format that is simplest to fabricate and ship.

Location
Thailand
Building type
Warehouse
Year
2023
Footprint
38 m × 75 m (125 ft × 246 ft) · about 2,850 m² (30,700 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About Warehouse 38×75

Warehouse 38×75 is a 2023 project in Thailand measuring 38 by 75 m, which works out to about 125 by 246 ft and some 30,700 sq ft. That is a mid-size building by US standards, the kind of space a regional distributor, building supply yard or light manufacturer might put up on a few acres.

For a US building at this scale, World Steel can provide the complete structural steel package along with calculations for permit review and the erection documents your crew needs. The factory is IAS AC472 accredited, which some jurisdictions take into account for special inspections; the building official makes that call. Share your project details to get a scope and price.

At about 2,850 m² (30,700 sq ft), this warehouse is a common size for US light-industrial parks. A 38 m (125 ft) width is near the upper end for a single clear span that stays economical.

In context

Warehouse 38×75 by the numbers

Footprint

About 2,850 m² (30,680 sq ft) of footprint, about 53% of a US football field with end zones.

It is 38 m (125 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.

By footprint it ranks 14th of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 38×75 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Warehouse 38×75 in 2023, together with 21 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.