What is a structural Design Report?
+
It is the set of structural calculations for a steel building: the codes, materials, loads and load combinations used, the analysis model, the check of every member and connection, deflection and drift, and the column base reactions. World Steel issues one for every structure it designs and fabricates.
Is a Design Report the same as structural calculations?
+
Yes. Building departments usually say structural calculations, engineers often say calc package, and our title block says Design Calculation Report. They all mean the document that proves the steel works.
Who approves the Design Report on a US project?
+
The Engineer of Record of the US contractor, our customer. They review it with the approval drawings, approve it and handle the professional stamp under the rules of their state. World Steel designs and fabricates the steel and answers every review comment.
Does World Steel stamp the calculations?
+
No. World Steel prepares the calculations and drawings. The professional stamp and the permit submittal stay with the US contractor and its Engineer of Record.
When do we receive the Design Report?
+
With the approval drawings and the column base reactions, right after the contract is signed and the down payment is received. It is revised after each round of review comments until your engineer approves it.
Which codes is the steel designed to?
+
To the editions of the IBC and ASCE 7 adopted where your building stands, with steel members to AISC 360, cold-formed purlins and girts to AISI S100, welding to AWS D1.1 and serviceability guided by IBC and the MBMA manual. Seismic projects add AISC 341 and AISC 358. The editions are written on the first pages of the report.
Can the report use ASD instead of LRFD?
+
Yes. The method is agreed on the design basis. Most of our reports use LRFD, and ASD is used when your Engineer of Record prefers it.
What does a ratio of 0.95 mean?
+
The member uses 95 percent of the strength the code allows under its worst load combination. Anything under 1.00 passes. Ratios close to 1.00 show an efficient design; they are not a warning.
What are base reactions and who uses them?
+
The forces each column puts on its foundation for each load case: vertical load, uplift, shears and any moment. Your foundation engineer uses them to design footings, piers and anchor rods.
Are base reactions issued before the full approval set?
+
They come with the approval drawings, so your foundation engineer can start right after award. If your schedule needs them earlier, tell us at the quote stage and we plan the design order around it.
Is the report in metric or US units?
+
Our analysis works in SI units, millimeters and kilonewtons, and the drawings show the dimensions your project needs. If your engineer needs results in US units, agree it on the design basis at the quote stage.
Does the report cover the foundations?
+
No. It gives the base reactions and the anchor rod forces. The footings, piers and anchorage embedment are designed by the foundation engineer on the US side.
Can I see a real Design Report before I award?
+
Yes. The download center has a real 31-page World Steel Design Report for an elevated parking deck in a high seismic zone, with project details removed and a small SAMPLE box on each page. Read it free online, or share your details to download the PDF.
Does the report change if we add a mezzanine or equipment later?
+
Any new load is checked against the approved model. Tell us before fabrication and we revise the report; after handover, the approved report in your closeout file is the starting point for the check.
Who checks the calculations inside World Steel?
+
Every report is prepared by a design engineer and checked by a second engineer before it is issued, with both noted on the pages.