Project overview
About Warehouse 40×240
Warehouse 40×240 in Thailand is listed at 40 by 240 m, roughly 131 by 787 ft and over 100,000 sq ft. A building six times as long as it is wide resembles many US cross-dock and production facilities, where the length follows the flow of goods or the run of a process line from one end to the other.
On a building this long, logistics matter as much as engineering. World Steel can group shipments by building zone so your erector can start at one end while later bays are still arriving, and the drawings show which bundles belong where. Design stays on the US basis your Engineer of Record sets. Send your project details to plan a long-building package.
If the name gives the plan in meters, this is a 40 m by 240 m building of about 9,600 m² (103,000 sq ft). Long buildings like this are usually shipped in several lots, packed in the order the US contractor will erect them.
Gallery
Warehouse 40×240 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 40×240 by the numbers
Footprint
About 9,600 m² (103,330 sq ft) of footprint, roughly 1.8 times a US football field with end zones.
It is 40 m (131 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.
By footprint it ranks 3rd of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 40×240 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2019
Tuatong 2 Warehouse
Warehouse
Photo
Thailand · 2024
Warehouse 20×36 & Warehouse 20×24
Warehouse
Photo
Thailand · 2023
Warehouse 38×75
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.