Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the HDD Warehouse, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

HDD Warehouse Structural steel for a warehouse in Thailand

This 2020 project is a steel warehouse in Thailand. Every bolted connection is detailed in the shop drawings, so the US contractor who erects a building like this works from marked parts and a clear erection plan.

Location
Thailand
Building type
Warehouse
Year
2020
Next step Plan a similar building →

Project overview

About HDD Warehouse

HDD Warehouse in Thailand was completed in 2020 on a steel structure that World Steel engineered, fabricated and supplied. A storage building of this kind earns its value through a simple, efficient envelope that goes up in an orderly way, protects goods securely and leaves the floor as open as the owner’s operation needs, without excess steel.

That is exactly what US warehouse owners ask for. A pre-engineered approach lets us tune frame depth, bay spacing and secondary members to your loads instead of using oversized standard sections. Options go to your Engineer of Record for approval, and erection drawings with piece marks go to your erector. Tell us the clear height and door layout you need to get started.

A pre-engineered warehouse is erected from the shop drawings and erection drawings, so their quality decides how smoothly the work goes on site. World Steel supplies shop drawings for every project at no extra cost, and the US contractor approves them before fabrication.

In context

HDD Warehouse by the numbers

In the portfolio

HDD Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied HDD Warehouse in 2020, together with 26 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.