- Location
- Thailand
- Building type
- Factory
- Year
- 2025
Project overview
About JRI New Factory
JRI New Factory is a 2025 industrial project in Thailand with a World Steel structural frame. Factories differ from warehouses in what hangs from and sits on the steel: process equipment, piping, ductwork and, in many plants, overhead cranes, all of which shape the frame design and the connections well before fabrication begins.
US manufacturers adding or replacing a plant can bring World Steel in early, so that equipment loads, crane runways and utility supports are captured in the SAP2000 model and coordinated through BIM/IFC with the process engineers. The approved frame is detailed in Tekla Structures and shipped in erection order. Contact us with your plant layout and equipment list.
A new factory is laid out from the inside out: the production line, the material flow and the utility routes come first, and the frame fits around them. World Steel asks for the process layout early, because column positions that block a line cost far more to fix later.
Gallery
JRI New Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
JRI New Factory by the numbers
In the portfolio
JRI New Factory is one of 33 factories in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied JRI New Factory in 2025, together with 6 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2020
Boss Pharmacere Factory
Factory
Photo
Thailand · 2019
TPlas Factory
Factory
Photo
Thailand · 2019
Thailand Factory 2019
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.