Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Maesod Warehouse, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Maesod Warehouse Structural steel for a warehouse in Thailand

A steel warehouse in Thailand (2020). Built in a border trade town, it is a typical warehouse for a transit and cross-dock operation like those along US interstate corridors.

Location
Thailand
Building type
Warehouse
Year
2020
Next step Plan a similar building →

Project overview

About Maesod Warehouse

Maesod Warehouse is a storage building in Thailand completed in 2020, with World Steel responsible for steel design, fabrication and supply. Like every export job, it relied on a package that left the factory complete and correctly labeled, because a missing part cannot be fetched from a shop across town once the steel is sitting on a distant site.

That matters for a US ranch, farm or rural business ordering steel from overseas. We check every shipment against the bill of materials, mark each piece to match the erection drawings and pack loads in the order your crew will need them. Design follows IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis. Send your site location to discuss shipping options.

Mae Sot is a border town on Thailand's main land route to Myanmar, and warehouses there handle goods in transit. Cross-dock warehouses near US interstates and border crossings have the same brief: many dock doors, wide aprons and fast truck turnover.

In context

Maesod Warehouse by the numbers

In the portfolio

Maesod Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Maesod Warehouse in 2020, together with 26 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.