Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long factory building framed with red tapered portal frames and roof purlins

World Steel job in Vietnam (Tay Ninh Province): tapered portal frames.

Ho Chi Minh City, Vietnam

FAPV Factory Structural steel for a factory in Vietnam

This 2019 project is a factory building in Ho Chi Minh City, Vietnam. A reference for long-bay industrial buildings where future expansion has to be planned from day one.

Location
Ho Chi Minh City, Vietnam
Building type
Factory
Year
2019
Next step Plan a similar building →

Project overview

About FAPV Factory

World Steel engineered and supplied the steel frame for FAPV Factory, an industrial building in Ho Chi Minh City completed in 2019. It is part of a long run of factory projects the company has delivered in southern Vietnam’s manufacturing belt.

General contractors bidding US factory work want a steel supplier who returns complete drawings and a clear bill of materials. For a comparable American project we provide design calculations to IBC 2024 and AISC 360 or AISI S100 as applicable, erection drawings, anchor bolt plans and a sequenced shipping list. Send your bid set and we will respond with a steel proposal.

FAPV Factory in Ho Chi Minh City, supplied in 2019. Factories inside the city sit on smaller lots with tight access, so steel deliveries are scheduled and packed to be unloaded and erected in a set order.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

FAPV Factory by the numbers

In the portfolio

FAPV Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied FAPV Factory in 2019, together with 19 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.