Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Siam Lubric Warehouse, Thailand on site

Site photo, World Steel project archive.

Thailand

Siam Lubric Warehouse Structural steel for a warehouse in Thailand

A steel warehouse in Thailand (2024). Storage for lubricants and chemicals, a reference for US contractors building warehouses with segregated hazardous-materials storage.

Location
Thailand
Building type
Warehouse
Year
2024
Next step Plan a similar building →

Project overview

About Siam Lubric Warehouse

Siam Lubric Warehouse is a 2024 steel warehouse in Thailand, engineered and supplied by World Steel. It is a useful reminder for US owners that the steel frame is only one part of a storage building’s code story: what you store sets the occupancy group, which in turn drives fire separation, ventilation and egress decisions under the IBC.

Those decisions affect the steel too, through wall openings, roof penetrations for ventilation and any interior separation walls. World Steel coordinates them with your architect and Engineer of Record so the framing supports the approved layout. Your local building department makes the final call on code compliance. Share what you plan to store and your site to begin.

Lubricants are flammable liquids, so a warehouse that stores them follows fire code rules on storage height, sprinklers and separation. In the US, IFC and NFPA requirements shape the building before the steel is sized, and World Steel works from the layout your fire protection engineer sets.

In context

Siam Lubric Warehouse by the numbers

In the portfolio

Siam Lubric Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Siam Lubric Warehouse in 2024, together with 16 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.