Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the 3 Storey College of Medicine, Philippines on site

Site photo, World Steel project archive.

Philippines

3 Storey College of Medicine Structural steel for a multi-storey & civil building in Philippines

World Steel's 2023 multi-storey civil building in the Philippines. It shows World Steel working beyond single-storey sheds into framed floors and public-use buildings.

Location
Philippines
Building type
Multi-storey & civil building
Year
2023
Next step Plan a similar building →

Project overview

About 3 Storey College of Medicine

The 3 Storey College of Medicine is a 2023 education building in the Philippines, framed with World Steel structural steel over three floors. Teaching buildings carry classrooms, labs and assembly spaces, each with its own load and layout demands.

US colleges, charter schools and training centers build similar three-story blocks. Under IBC 2024, education and assembly occupancies bring added requirements for fire protection and egress that your architect sets, while the frame follows AISC 360 and ASCE 7-22. We provide calculations, Tekla drawings and a floor-by-floor shipping sequence. Send your design documents for review.

A three-storey medical college combines classrooms, labs and lecture halls, each with different floor loads and spans. Educational buildings in the US are often in IBC Risk Category III, which affects the design loads, so World Steel confirms the category with the Engineer of Record first.

In context

3 Storey College of Medicine by the numbers

In the portfolio

3 Storey College of Medicine is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 8 projects listed for Philippines.

World Steel supplied 3 Storey College of Medicine in 2023, together with 21 other projects shown here from that year.

More multi-storey and civil buildings:

Design points

What a multi-storey & civil building needs from its steel

General points for every multi-storey & civil building, not specific to this one.

Stacked tolerances

Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.

Learn more →

Risk category matters

Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.

Learn more →

Fire-resistance ratings

Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.

Planning a multi-storey & civil building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.