Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Based Meat Factory, Thailand on site

Site photo, World Steel project archive.

Thailand

Based Meat Factory Structural steel for a factory in Thailand

A factory building in Thailand (2022). Meat processing needs hygienic, easy-to-clean framing, a reference for US protein and food plant contractors.

Location
Thailand
Building type
Factory
Year
2022
Next step Plan a similar building →

Project overview

About Based Meat Factory

World Steel supplied the steel structure for Based Meat Factory, a food production plant in Thailand completed in 2022. Food plants are a demanding building type in general: owners usually want wash-down friendly interiors, room overhead for refrigeration and process piping, and layouts that keep raw and finished product apart. The frame has to leave space for all of that without getting in the way.

US meat, poultry and prepared-food processors face the same planning questions, plus USDA or FDA facility expectations that your process designer leads. We supply primary and secondary steel engineered to the code basis your Engineer of Record confirms, typically IBC 2024 and ASCE 7-22, and coordinate openings and hanging loads through the BIM model. Share your process layout for an early steel concept.

Meat processing areas are washed down every day, so the steel inside needs a coating that resists moisture and cleaning chemicals, and ledges where dirt can collect are kept to a minimum. US meat and poultry plants follow USDA sanitation rules that lead to the same choices.

In context

Based Meat Factory by the numbers

In the portfolio

Based Meat Factory is one of 33 factories in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Based Meat Factory in 2022, together with 12 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.