Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Seaside industrial site with a steel warehouse at its center, wide drone shot

Wide aerial of a World Steel warehouse on a seaside site outside the US.

Ho Chi Minh City, Vietnam

Saigon - Cu Chi Beer Factory Structural steel for a factory in Vietnam

This 2018 project is a factory building in Ho Chi Minh City, Vietnam. Industrial frames like this are designed around the equipment inside them, not just the roof over it.

Location
Ho Chi Minh City, Vietnam
Building type
Factory
Year
2018
Next step Plan a similar building →

Project overview

About Saigon - Cu Chi Beer Factory

Saigon - Cu Chi Beer Factory is a 2018 brewery building in the Cu Chi area of Ho Chi Minh City. World Steel supplied the structural steel for this beverage production facility.

Brewing and beverage plants in the US carry tank loads, piping, platforms and wet production zones that a plain warehouse does not. Those loads and any corrosion protection requirements are set by your Engineer of Record and process designer, and we design and fabricate to that specification. Craft breweries expanding into production halls can send their equipment plan for an early framing study.

Breweries combine wet process areas, tall fermentation tanks and a large packaging and storage hall. The tank area often needs a taller frame or platforms, which are designed as part of the main structure.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Saigon - Cu Chi Beer Factory by the numbers

In the portfolio

Saigon - Cu Chi Beer Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Saigon - Cu Chi Beer Factory in 2018, together with 5 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.