- Location
- Guyana
- Building type
- Warehouse
- Year
- 2022
Project overview
About Guyana Warehouse 2
Guyana Warehouse 2 is the second pre-engineered steel warehouse World Steel delivered to Guyana in 2022. Two buildings to the same country in one year point to an export process that works well enough to repeat.
US owners with more than one building to plan, such as a farm adding storage or a distributor adding a second site, can order the same way. A design reused across buildings is reviewed by your Engineer of Record for each site’s loads under ASCE 7-22, then fabricated and shipped as separate packages. Ask us to quote your next building.
A second warehouse for Guyana in the same year shows that the first shipment worked well enough for a repeat order. Long-distance repeat business like this is the kind of track record US buyers ask about.
Gallery
Guyana Warehouse 2 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Guyana Warehouse 2 by the numbers
In the portfolio
Guyana Warehouse 2 is one of 63 warehouses in the World Steel portfolio on this site, and one of 3 projects listed for Guyana.
World Steel supplied Guyana Warehouse 2 in 2022, together with 12 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
3D model
Guyana · 2022
Guyana Warehouse
Warehouse
Photo
Thailand
Warehouse 72×74
Warehouse
Photo
Thailand · 2020
Maesod Warehouse
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.