- Location
- Thailand
- Building type
- Warehouse
- Footprint
- 26 m × 49 m (85 ft × 161 ft) · about 1,274 m² (13,700 sq ft)
Project overview
About Warehouse 26×49
Warehouse 26×49 is a steel warehouse in Thailand with a footprint of 26 by 49 m, about 85 by 161 ft and nearly 13,700 sq ft. In the US, that size suits equipment storage, a retail or wholesale back-of-house building, or a combined workshop and parts store where everything sits under a single open roof.
World Steel prepares the design calculations for your building department, the anchor bolt layout for your foundation contractor and the erection set for your erector, so each party on a US job has what it needs from one source. Steel ships sorted by sequence and clearly marked. To compare a building of this size for your site, send us the basics.
A 26 m by 49 m building gives about 1,270 m² (13,700 sq ft). If future growth is likely, the end wall can be designed as a removable frame so the building can be extended later without new design work for the existing bays.
Gallery
Warehouse 26×49 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 26×49 by the numbers
Footprint
About 1,274 m² (13,710 sq ft) of footprint, about 24% of a US football field with end zones.
It is 26 m (85 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.
By footprint it ranks 19th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 26×49 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2019
Tuatong Warehouse
Warehouse
Photo
Thailand · 2020
ASEAN Warehouse
Warehouse
Photo
Thailand · 2022
Mongkolphisan Warehouse 80×70
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.