- Location
- Ho Chi Minh City, Vietnam
- Building type
- Factory
- Year
- 2023
Project overview
About Nitto Denko Factory
Nitto Denko Factory in Ho Chi Minh City, Vietnam, was completed in 2023 with a steel structure designed, fabricated and supplied by World Steel. Factories for international manufacturers tend to come with detailed owner standards for documentation, inspection and coordination, and meeting them is a real test of a supplier’s engineering and quality systems.
US plants for global manufacturers, whether new builds or expansions, bring corporate engineering standards of their own. We work to the code basis your Engineer of Record sets, typically IBC 2024, ASCE 7-22 and AISC 360, supply calculations and shop drawings for review, and fabricate in an IAS AC472-accredited facility. Share your owner standards with your inquiry.
Nitto Denko is a Japanese manufacturer, and Japanese owners abroad apply their home inspection standards to local builders. Work for owners like this is a good check of documentation and tolerances, which matters to US owners as well.
Gallery
Nitto Denko Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Nitto Denko Factory by the numbers
In the portfolio
Nitto Denko Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Nitto Denko Factory in 2023, together with 21 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Tay Ninh Province, Vietnam
Tay Ninh AA Corporation Factory
Factory
Photo
Vinh Long Province, Vietnam · 2024
Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory
Factory
Photo
Tay Ninh Province, Vietnam · 2022
Brotex Yarn Manufacturing Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.