- Location
- Chon Thanh, Dong Nai Province, Vietnam
- Building type
- Factory
- Year
- 2026
Project overview
About New Hope Dong Nai Feed Factory
New Hope Dong Nai Feed Factory in Chon Thanh, Dong Nai Province, Vietnam, is listed for 2026, with World Steel providing steel structure design, fabrication and supply. It is one of the newest entries in the company’s feed-plant work, following several feed factories completed in 2024, and it reflects current engineering and fabrication practice.
For US agribusinesses, a current reference is worth more than an old one, because codes, software and fabrication methods keep moving. We design feed mill buildings and warehouses under IBC 2024 and ASCE 7-22, coordinate equipment supports with your process vendor, and present value-engineering options for your Engineer of Record. Send your project brief and site address.
New Hope is one of the world's largest feed producers. A 2026 feed plant shows World Steel working for an international agribusiness owner on current projects.
Gallery
New Hope Dong Nai Feed Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
New Hope Dong Nai Feed Factory by the numbers
In the portfolio
New Hope Dong Nai Feed Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied New Hope Dong Nai Feed Factory in 2026, together with 6 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Vinh Long Province, Vietnam · 2024
Hai Dai Vinh Long Cattle, Poultry and Aquatic Feed Factory
Factory
Photo
Hai Phong City, Vietnam · 2024
Sheng Long Biotech (Hai Duong) Aquatic Feed Factory
Factory
Photo
Hai Phong City, Vietnam · 2020
Hai Duong Tongwei Animal Feed Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.