- Location
- Thailand
- Building type
- Port facility
- Year
- 2020
Project overview
About Winmax Export Project
The Winmax Export Project is a port facility in Thailand completed in 2020, for which World Steel designed, fabricated and supplied steel. Waterfront buildings generally face harsher conditions than inland ones, with salt air, open exposure and heavy cargo handling, so material protection and robust detailing deserve extra attention from the first design meeting.
US port authorities, terminal operators and waterfront industries can look to this project as experience with steel in a port setting. For a US terminal shed or cargo building, we design to the loads ASCE 7-22 sets for your site and propose corrosion protection options for your Engineer of Record to approve. Send your site and intended use to start a conversation.
Winmax Export is listed as a port facility. Structures near the water need a coating system rated for marine exposure and access for future maintenance, so the coating choice is part of the design, not only the shop finish.
Gallery
Winmax Export Project images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Winmax Export Project by the numbers
In the portfolio
Winmax Export Project is one of 2 port facilities in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Winmax Export Project in 2020, together with 26 other projects shown here from that year.
More port facilities:
Design points
What a port facility needs from its steel
General points for every port facility, not specific to this one.
Severe exposure
Terminal steel near salt water gets the most robust protection, with each coat inspected and recorded.
Learn more →Fatigue from daily cycles
Cranes and heavy vehicles load terminal structures many times a day, so connections are checked for fatigue.
Learn more →Inspection from day one
An owner inspection and touch-up schedule, set at handover, keeps a waterfront structure serviceable.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Port facility. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Singapore · 2025
PSA Port
Port facility
Photo
Thailand · 2018
Aircraft Hangar
Aircraft hangar · 200 t steel
Photo
Singapore · 2020
Steel Bridge
Steel bridge
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a port facility in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.