Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long-span warehouse inside an industrial campus, seen by drone

World Steel building abroad, from the air (location not stated).

Kosrae, Federated States of Micronesia

Kosrae Hospital 200 t of structural steel for a multi-storey & civil building in Federated States of Micronesia

A hospital in Kosrae, Federated States of Micronesia, built on about 200 tonnes of hot-dip galvanized structural steel. World Steel designed the frame, fabricated it in Vietnam and shipped it to the island.

Location
Kosrae, Federated States of Micronesia
Building type
Multi-storey & civil building
Structural steel
200 t
Next step Plan a similar building →

Project overview

About Kosrae Hospital

Kosrae Hospital is a healthcare building in Kosrae, one of the states of the Federated States of Micronesia, framed with about 200 metric tons of World Steel structural steel. It sits on a small, remote island, so every member had to arrive complete and correctly marked, because replacement parts are not a short drive away. That same discipline matters on a rural US job site.

Medical buildings are a demanding category in any market: they carry heavy mechanical loads, need careful coordination with ductwork and services, and draw close attention at plan review. For a US clinic or hospital addition, World Steel works to the code basis your Engineer of Record sets, typically IBC 2024 with ASCE 7-22 loads, and supplies drawings and calculations for permit. Contact us to review your healthcare project.

For healthcare work, the steel model has to leave room for ducts, medical gas and plumbing above the ceiling. World Steel coordinates beam depths and web openings with the mechanical design in the model, so services pass through the frame where they were planned instead of being cut in on site.

Drawn illustration of multi-storey & civil building, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Kosrae Hospital by the numbers

Steel weight

About 200 metric tons of structural steel (220 short tons), about 8% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 14th largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

Kosrae Hospital is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 1 projects listed for Federated States of Micronesia.

Closest in steel weight:

Design points

What a multi-storey & civil building needs from its steel

General points for every multi-storey & civil building, not specific to this one.

Stacked tolerances

Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.

Learn more →

Risk category matters

Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.

Learn more →

Fire-resistance ratings

Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Hot-dip galvanized steel structure: structural design, fabrication and shipping by World Steel.
Coating
Hot-dip galvanized structural steel
Shipping
Shipped by World Steel from Vietnam to Kosrae.

Planning a multi-storey & civil building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.