Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Coastal industrial zone with a steel warehouse, seen from the air

World Steel warehouse in a coastal industrial zone abroad, aerial photo.

Dong Nai Province, Vietnam

Tung Kuang Industrial Factory Structural steel for a factory in Vietnam

A factory building in Dong Nai Province, Vietnam (2019). A reference for long-bay industrial buildings where future expansion has to be planned from day one.

Location
Dong Nai Province, Vietnam
Building type
Factory
Year
2019
Next step Plan a similar building →

Project overview

About Tung Kuang Industrial Factory

Tung Kuang Industrial Factory, completed in 2019, is located in Dong Nai Province, a major industrial zone near Ho Chi Minh City. World Steel supplied the structural steel for the production building.

Industrial owners in the US usually want a frame that can take future change: added mezzanines, new openings or heavier roof equipment. Those are general design points to settle with your Engineer of Record before the steel is ordered, since adding capacity in the design stage is easier than reinforcing later. We model the options in SAP2000 and price each one. Send your requirements.

An industrial plant in Dong Nai Province, one of Vietnam's main manufacturing regions. Long, heavy production lines set the column grid in plants like this, so the frame is laid out around them.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Tung Kuang Industrial Factory by the numbers

In the portfolio

Tung Kuang Industrial Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Tung Kuang Industrial Factory in 2019, together with 19 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.