Steel frame of the NYT Warehouse, New York during erection

Site photo, World Steel project archive: steel frame erection.

New York, United States

NYT Warehouse 230 t of structural steel for a warehouse in United States

A pre-engineered steel warehouse in New York, built from 230 tonnes of World Steel framing. The site photos show the clear-span rafters being lifted into place by crane, frame by frame, from one end of the building to the other.

Location
New York, United States
Building type
Warehouse
Structural steel
230 t
Status
Completed
Next step Plan a similar building → Next step See all projects →

Project overview

About NYT Warehouse

NYT Warehouse is a US delivery in New York, built with about 230 metric tons of World Steel structural steel. That tonnage puts it among the larger American projects in the company’s portfolio and gives Northeast buyers a reference in a state where snow and wind loads usually weigh heavily in warehouse design.

An order of this size ships as many coordinated loads, so World Steel sorts members by erection sequence, labels each piece and supplies drawings that let the erector follow the frame bay by bay. Design follows AISC 360 for hot-rolled and built-up members and ASCE 7-22 loads for the site. If you are pricing a warehouse in New York or nearby states, send us your layout.

In New York, roof snow and drift against parapets or higher roofs often govern the purlin and rafter sizes on a warehouse, and local amendments can add to the ASCE 7 values. World Steel designs to the snow load your Engineer of Record confirms for the site, and the calculation package shows it clearly for plan review.

In context

NYT Warehouse by the numbers

Steel weight

About 230 metric tons of structural steel (254 short tons), about 9% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 11th largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

NYT Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 7 projects listed for United States.

Closest in steel weight:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Structural design, fabrication and export supply of the steel structure.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.