Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Seaside industrial site with a steel warehouse at its center, wide drone shot

Wide aerial of a World Steel warehouse on a seaside site outside the US.

Ho Chi Minh City, Vietnam

An Phu 3S Hyundai 400 t of structural steel for a commercial & retail building in Vietnam

World Steel's commercial building in Ho Chi Minh City, Vietnam. World Steel states about 400 tonnes of steel for it. No completion year is published for it. Open sales floors like this rely on long spans, which pre-engineered steel handles well.

Location
Ho Chi Minh City, Vietnam
Building type
Commercial & retail building
Structural steel
400 t
Next step Plan a similar building →

Project overview

About An Phu 3S Hyundai

An Phu 3S Hyundai in Ho Chi Minh City is a commercial building for vehicle sales and service, framed with about 400 metric tons of World Steel structural steel. That tonnage puts it well beyond a simple shed and into the range of a full dealership facility.

US auto dealers and their builders often combine a glazed showroom, service bays and parts storage in one structure. Each zone carries different spans and loads, so the frame mixes member types. We design that mix to IBC 2024 and AISC 360, coordinate it with your architect in BIM, and ship it sequenced by zone. Send your dealership plans for a proposal.

About 400 tonnes for a Hyundai 3S dealership, which combines sales, service and spare parts. Car dealerships in the US follow brand design standards with large glazed showrooms and service bays, and the frame has to match both.

Drawn illustration of commercial & retail building, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

An Phu 3S Hyundai by the numbers

Steel weight

About 400 metric tons of structural steel (441 short tons), about 16% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 9th largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

An Phu 3S Hyundai is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

More commercial and retail buildings:

Design points

What a commercial & retail building needs from its steel

General points for every commercial & retail building, not specific to this one.

Flexible floor plans

Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.

Learn more →

Curb appeal

Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.

Learn more →

Snow and roof steps

Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Commercial & retail building. Steel structure design, fabrication and supply by World Steel.

Planning a commercial & retail building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.