- Location
- Thailand
- Building type
- Warehouse
- Year
- 2026
- Footprint
- 30 m × 55 m (98 ft × 180 ft) · about 1,650 m² (17,800 sq ft)
Project overview
About Warehouse 30×55
Warehouse 30×55 is a 2026 steel building in Thailand measuring 30 by 55 m, or about 98 by 180 ft and nearly 17,800 sq ft. That is a familiar size in the US market, where a width of around 100 ft is a frequent starting point for warehouses, equipment storage and agricultural buildings that need open floor space.
When a US buyer brings us a building in this range, World Steel compares frame options in SAP2000 and offers value engineering choices to the Engineer of Record. The resulting package includes frames, secondary steel, bracing and anchor bolts, detailed in Tekla Structures and packed in erection order. Share your site and intended use to get a proposal.
A 30 m by 55 m building is about 1,650 m² (17,800 sq ft), a common size for a US light-industrial unit or a single-tenant warehouse. It is also a size where the choice between a single clear span and a frame with one interior column line can noticeably change the steel weight.
In context
Warehouse 30×55 by the numbers
Footprint
About 1,650 m² (17,760 sq ft) of footprint, about 31% of a US football field with end zones.
It is 30 m (98 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.
By footprint it ranks 17th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 30×55 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 30×55 in 2026, together with 6 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2023
Warehouse 16×50
Warehouse
Photo
Thailand · 2020
Thaworn Warehouse
Warehouse
Photo
Thailand
Warehouse 25×80
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.