- Location
- Thailand
- Building type
- Commercial & retail building
- Year
- 2020
Project overview
About Marko Khonkaen
Marko Khonkaen is a commercial and retail building in Thailand completed in 2020, with steel engineered, fabricated and supplied by World Steel. It sits alongside several other store projects the company has delivered in that country, which points to a repeatable approach to retail frames rather than a single one-off job, and that consistency is what a chain or developer needs from a steel supplier.
For a US strip center, standalone store or wholesale outlet, the takeaway is process: a frame analyzed in SAP2000, detailed in Tekla Structures, checked against AISC 360 and shipped in packages that follow the erection order. Your general contractor keeps control of the site, foundations and erection while we supply the engineered steel. Tell us your city and footprint to get a design basis and price.
A large-format store in Khon Kaen, in Thailand's northeast, served a regional market far from the capital. US retailers building in smaller metro areas face a similar question: how to deliver a full-size store efficiently when the site is far from the nearest steel service center.
Gallery
Marko Khonkaen images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Marko Khonkaen by the numbers
In the portfolio
Marko Khonkaen is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Marko Khonkaen in 2020, together with 26 other projects shown here from that year.
More commercial and retail buildings:
Design points
What a commercial & retail building needs from its steel
General points for every commercial & retail building, not specific to this one.
Flexible floor plans
Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.
Learn more →Curb appeal
Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.
Learn more →Snow and roof steps
Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Commercial & retail building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2023
Makro Prachinburi
Commercial & retail building
Photo
Thailand · 2020
SKB Marry Mart
Commercial & retail building
Photo
Thailand · 2020
Chumpon Market
Commercial & retail building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a commercial & retail building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.