Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Pegasus Warehouse, Thailand on site

Site photo, World Steel project archive.

Thailand

Pegasus Warehouse Structural steel for a warehouse in Thailand

A steel warehouse in Thailand, listed in World Steel's portfolio for 2022. A single-storey storage building of the kind US contractors bid for local distributors every month.

Location
Thailand
Building type
Warehouse
Year
2022
Next step Plan a similar building →

Project overview

About Pegasus Warehouse

Pegasus Warehouse is a 2022 storage building in Thailand whose steel structure World Steel engineered, fabricated and supplied. Warehouses make up a large share of World Steel’s project list, and each one adds to a body of tested frame layouts, connection details and packing methods that the engineering team can draw on when a new storage project arrives on the desk.

For a US buyer that experience matters, because a warehouse should not be engineered from a blank sheet every time. We adapt proven frame concepts to your snow, wind and seismic demands under ASCE 7-22, then document them for plan review. Your local contractor pours foundations and sets anchor bolts from our drawings. Email a sketch with eave height and bay spacing to begin.

A plain storage building is where an efficient design saves the most, because there is no process equipment or special finish to account for. World Steel's design optimization work focuses on these buildings: lighter frames that still meet the code, for the US contractor to approve.

In context

Pegasus Warehouse by the numbers

In the portfolio

Pegasus Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Pegasus Warehouse in 2022, together with 12 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.