- Location
- Tay Ninh Province, Vietnam
- Building type
- Factory
- Year
- 2022
Project overview
About Brotex Yarn Manufacturing Factory
Brotex Yarn Manufacturing Factory in Tay Ninh Province, Vietnam, was completed in 2022 with World Steel providing steel design, fabrication and supply. Textile plants in general run long lines of spinning and processing machinery in large, uninterrupted halls, often with climate-control equipment, so wide bays and generous roof capacity for ducts are common goals.
US textile, nonwovens and fiber producers have similar needs when they build or expand. We design long, wide production halls to AISC 360 and AISI S100 under IBC 2024 and ASCE 7-22, coordinate duct and equipment loads with your MEP engineer, and supply steel in packages sorted for erection. Send your machine layout for an early structural scheme.
Yarn spinning needs controlled temperature and humidity across a very large floor, so roof insulation and air handling are built into the design. The roof also carries ductwork and equipment, which the steel has to support without sagging.
Gallery
Brotex Yarn Manufacturing Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Brotex Yarn Manufacturing Factory by the numbers
In the portfolio
Brotex Yarn Manufacturing Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Brotex Yarn Manufacturing Factory in 2022, together with 12 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Dong Thap Province, Vietnam · 2018
Tien Giang Tongwei Animal Feed Factory (Phase 1)
Factory · 1,500 t steel
Photo
Hai Phong City, Vietnam · 2020
Hai Duong Tongwei Animal Feed Factory
Factory
Photo
Hai Phong City, Vietnam · 2024
Sheng Long Biotech (Hai Duong) Aquatic Feed Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.