Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Warehouse 20×36, Thailand on site

Site photo, World Steel project archive.

Thailand

Warehouse 20×36 Structural steel for a warehouse in Thailand

This project is a steel warehouse in Thailand. The project name gives its plan size as 20 × 36. No completion year is published for it. A 20 m span is the most common size for small US storage buildings, so it is a useful price-and-weight reference for contractors.

Location
Thailand
Building type
Warehouse
Footprint
20 m × 36 m (66 ft × 118 ft) · about 720 m² (7,800 sq ft)
Next step Plan a similar building →

Project overview

About Warehouse 20×36

Warehouse 20×36 is a steel warehouse in Thailand with a footprint of 20 by 36 m, about 66 by 118 ft and close to 7,750 sq ft. For many US small businesses, a building in this range is a first owned facility: big enough for stock, vehicles and a small office, yet simple enough for a local crew to erect with modest lifting equipment.

Metal building dealers and design-build firms in the US can use World Steel as the engineering and fabrication source behind a project of this size, with the local team handling sales, foundations and erection. Every kit comes with calculations, anchor bolt plans and erection drawings. Contact us to discuss supply for a single building or a recurring dealer program.

A 20 m by 36 m building is about 720 m² (7,750 sq ft), a size many US businesses choose for a combined shop and store. Small buildings like this are often where an owner first decides between a metal building system and conventional framing.

In context

Warehouse 20×36 by the numbers

Footprint

About 720 m² (7,750 sq ft) of footprint, about 13% of a US football field with end zones.

It is 20 m (66 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.

By footprint it ranks 24th of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 20×36 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.