- Location
- Cambodia
- Building type
- Factory
Project overview
About Greenfeed Factory
Greenfeed Factory in Cambodia is an animal feed production building with a structural steel frame from World Steel. It joins the Tongwei feed factories in Vietnam as part of the company’s experience with feed manufacturing.
For US feed mills, pet food plants and grain processors, that track record covers a building type with demanding layouts: tall process areas, bulk ingredient storage and loadout. Equipment and dust-related requirements are set by your Engineer of Record and process engineer. We design the steel to suit, under IBC 2024 and ASCE 7-22, and ship it in erection order. Talk to us.
Greenfeed is a feed and livestock group operating across Southeast Asia, and this plant is in Cambodia. Steel shipped across a border by road and sea needs the same packing and documentation as US exports.
Gallery
Greenfeed Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Greenfeed Factory by the numbers
In the portfolio
Greenfeed Factory is one of 33 factories in the World Steel portfolio on this site, and one of 2 projects listed for Cambodia.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Chon Thanh, Dong Nai Province, Vietnam · 2026
New Hope Dong Nai Feed Factory
Factory
Photo
Quang Ngai Province, Vietnam · 2020
Millennium Furniture Factory
Factory
Photo
Thailand · 2020
Boss Pharmacere Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.