Steel structure of the Warehouse 53×120, Thailand on site

Site photo, World Steel project archive.

Thailand

Warehouse 53×120 Structural steel for a warehouse in Thailand

This 2023 project is a steel warehouse in Thailand. The project name gives its plan size as 53 × 120. A wide-span warehouse where crane-free open space mattered more than height, a common US bulk-storage brief.

Location
Thailand
Building type
Warehouse
Year
2023
Footprint
53 m × 120 m (174 ft × 394 ft) · about 6,360 m² (68,500 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About Warehouse 53×120

Warehouse 53×120, supplied to Thailand in 2023, covers a 53 by 120 m footprint, about 174 by 394 ft and close to 68,000 sq ft. It sits in the same size class as many US big-box and logistics buildings, where owners balance wide open areas against the extra steel weight that very long rafters bring.

On a similar US project, World Steel can help the team settle the column grid, bay spacing and roof slope early, then carry the approved design into shop drawings and fabrication. The finished package ships as containerized or breakbulk cargo, with each quote stating the Incoterm and the importer of record. Contact us with your size and location to begin.

At 53 m (174 ft) wide, the building sits where a clear span and a multi-span frame are both realistic, and the decision depends on how the floor will be used. World Steel prices both options for comparison when the owner asks.

In context

Warehouse 53×120 by the numbers

Footprint

About 6,360 m² (68,460 sq ft) of footprint, roughly 1.2 times a US football field with end zones.

It is 53 m (174 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.

By footprint it ranks 6th of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 53×120 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Warehouse 53×120 in 2023, together with 21 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.