Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Warehouse 12×24 & Warehouse 12×18, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Warehouse 12×24 & Warehouse 12×18 Structural steel for a warehouse in Thailand

World Steel's 2024 steel warehouse in Thailand. Two buildings were supplied together under one order. It is an example of the plain, repeatable warehouse format that is simplest to fabricate and ship.

Location
Thailand
Building type
Warehouse
Year
2024
Footprint
12 m × 24 m (39 ft × 79 ft) and 12 m × 18 m (39 ft × 59 ft) (two buildings) · about 504 m² (5,400 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About Warehouse 12×24 & Warehouse 12×18

This 2024 order in Thailand covered two small steel warehouses, one 12 by 24 m and one 12 by 18 m, or about 39 by 79 ft and 39 by 59 ft. Small buildings like these make up a large share of US metal building demand, from farm storage and garages to workshops and back-of-house space for retail sites.

Ordering two buildings together, especially at a shared width, lets frames and details repeat across both structures, which can simplify drawings and erection. World Steel ships small orders as labeled kits with anchor bolt plans, so a local contractor or dealer can set foundations and assemble the frames. Tell us what you need, even if it is just one or two small buildings.

Two small buildings with the same 12 m width can share frame designs, connections and secondary members, which keeps fabrication simple. US owners who need a storage shed next to a workshop can order both in one steel package the same way.

In context

Warehouse 12×24 & Warehouse 12×18 by the numbers

Footprint

About 504 m² (5,430 sq ft) of footprint, about 9% of a US football field with end zones.

It is 12 m (39 ft) wide. A width under 20 m is usually one clear span, the size of many US shops, storage sheds and small warehouses.

By footprint it ranks 26th of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 12×24 & Warehouse 12×18 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Warehouse 12×24 & Warehouse 12×18 in 2024, together with 16 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.