- Location
- Thailand
- Building type
- Warehouse
- Year
- 2024
- Footprint
- 54 m × 112 m (177 ft × 367 ft) · about 6,048 m² (65,100 sq ft)
Project overview
About Warehouse 54×112
Warehouse 54×112 is a 2024 project in Thailand with a footprint of 54 by 112 m, about 177 by 367 ft or 65,000 sq ft. That width is well beyond a typical metal building, so the frame layout, whether a very deep clear span or several spans with interior columns, becomes the decision that shapes both cost and the way the floor can be used.
US owners with wide floor plates, such as manufacturers, cold storage operators and agricultural processors, can ask World Steel to study several frame layouts and present value engineering options to their Engineer of Record. The approved design is detailed in Tekla Structures and shared as BIM/IFC files for coordination. Send your layout and intended use to start the study.
A building more than 50 m wide often uses a modular frame with one or more interior columns, unless the owner needs a fully clear floor. That choice is made with the owner and the Engineer of Record, since it changes both the steel weight and how the floor can be used.
In context
Warehouse 54×112 by the numbers
Footprint
About 6,048 m² (65,100 sq ft) of footprint, close to the area of a US football field with end zones.
It is 54 m (177 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.
By footprint it ranks 7th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 54×112 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 54×112 in 2024, together with 16 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2020
AMW Warehouse
Warehouse
Photo
Thailand
Warehouse 72×74
Warehouse
Photo
Thailand · 2022
Warehouse 19.4×37
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.