- Location
- Thailand
- Building type
- Warehouse
- Year
- 2020
Project overview
About Thaworn Warehouse
Thaworn Warehouse in Thailand was completed in 2020 on a steel frame that World Steel designed, fabricated and supplied. It is a straightforward storage project, and that is its value as a reference: most warehouse buyers need a dependable building delivered as drawn, rather than a showpiece, and the process behind it is what they are really buying.
If you are comparing steel building suppliers for a US warehouse, ask each one how drawings are produced, who checks them, how steel is packed and which code basis they use. Our answers: SAP2000 analysis, Tekla Structures detailing, IAS AC472-accredited fabrication, erection-sequence packing, and IBC 2024 with ASCE 7-22 by default. Request a sample submittal set to compare.
Everyday storage buildings make up most of any steel plant's work, and their quality shows whether the shop is consistent. The same IAS AC472 quality program covers this building and World Steel's largest flagship packages.
Gallery
Thaworn Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Thaworn Warehouse by the numbers
In the portfolio
Thaworn Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Thaworn Warehouse in 2020, together with 26 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2022
Pegasus Warehouse
Warehouse
Photo
Thailand · 2023
Warehouse 38×75
Warehouse
Photo
Thailand
Warehouse 20×36
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.