Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Tall columns and rafters inside a clear-span building with roof sheeting on

Clear-span interior on a World Steel job in southern Vietnam.

Dong Nai Province, Vietnam

Sun-Tech Mechanical Components Factory Structural steel for a factory in Vietnam

A factory building in Dong Nai Province, Vietnam (2024). A reference for long-bay industrial buildings where future expansion has to be planned from day one.

Location
Dong Nai Province, Vietnam
Building type
Factory
Year
2024
Next step Plan a similar building →

Project overview

About Sun-Tech Mechanical Components Factory

Sun-Tech Mechanical Components Factory in Dong Nai Province, Vietnam, was completed in 2024, with World Steel delivering the steel structure design, fabrication and supply. Component and machining plants in general need open production floors, even daylight and good ventilation, along with room overhead for material handling, so the roof structure is planned around the operation.

US machine shops, parts suppliers and contract manufacturers moving into a new building can use the project as a recent comparable. We size frames for your clear height and any material-handling loads that your Engineer of Record sets, design to IBC 2024 and ASCE 7-22, and ship the steel in erection order. Send your shop layout to discuss options.

A factory for mechanical components, in Dong Nai Province, one of Vietnam's main industrial regions. Machining and assembly plants often add bridge cranes, so the frame is designed with crane loads from the start.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Sun-Tech Mechanical Components Factory by the numbers

In the portfolio

Sun-Tech Mechanical Components Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Sun-Tech Mechanical Components Factory in 2024, together with 16 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.