Cut, not bent
How a curve gets into a built-up member
The shape is decided in the model and cut into the web, so the member never has to be forced into it.
Shape from the model
The curve or camber is drawn in the Tekla model and goes to the CNC cutting files with the rest of the member.
Web cut to the curve
The web profile is cut on CNC laser, plasma or gas machines, so the radius is in the steel before any welding.
Flanges follow the edge
Flange plates are fitted along the shaped web edge in jigs and tacked to the shop drawing.
Welded and measured
Web-to-flange welds are run by submerged arc, then the curve or camber is measured against the drawing.
Shapes
Three kinds of curved member
-
Arched rafters
Rafters with a constant or changing radius for barrel and arched roofs.
-
Cambered beams
Beams cut with an upward curve that dead load will pull back toward level.
-
Curved and tapered
A curved outer flange with a straight or tapered inner edge, for vaults that change depth.
Camber
Camber that settles into level
- Set by your Engineer of Record
- Camber offsets the deflection from dead load, so floors and roofs end up near level. The amount comes from the design.
- Cut, not heat-cambered
- On a built-up member the camber is cut into the web profile, so no heating or cold bending is needed afterward.
- Measured and recorded
- Camber is measured on the finished member and recorded on its dimensional check sheet, against the tolerance in the AISC Code of Standard Practice.
Long spans that also need depth past the rolled range are covered under welded plate girders and transfer girders.
Reference
Goldfields Arts Centre
Kalgoorlie-Boulder, Western Australia · 400 t
Curved built-up rafters made in our Vietnam plant and exported for a performing arts building.
See the project


Questions
Curved and cambered member questions
Do you bend beams to make curved members?
No. Our curved members are built up: the web is cut to the curve from the model and the flanges are welded along it. We do not claim section-bending of rolled beams.
How tight a radius can a curved built-up member have?
It depends on flange width and thickness, because the flange plate has to follow the curved web edge during fit-up. Our engineers check each radius with you during design rather than quoting a single limit.
What is camber and why does a beam need it?
Camber is a small upward curve built into a beam so that, once the dead load is on, it settles back toward level. It is common on long floor and roof beams and on transfer girders.
How is camber checked before shipping?
Each cambered member is measured on supports in the shop and the reading is recorded by piece mark, against the tolerance in the AISC Code of Standard Practice.
Can curved members be split for shipping?
Yes. Curved rafters are split at bolted end-plate splices placed in design, so each piece fits a container or flat rack and the arch goes back together with bolts on site.
Built for large jobs
Curved and cambered members for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included