- Location
- Hope Valley, Western Australia, Australia
- Building type
- Warehouse
- Structural steel
- 60 t
Project overview
About Mautic Workshop
Mautic Workshop in Hope Valley, Western Australia, is a steel workshop framed with about 60 metric tons of World Steel structural steel. Buildings of this size and use are among the most common requests from US trades: a contractor shop, equipment repair bay or fabrication space where the owner needs clear height, wide doors and a floor free of interior columns.
A US owner planning a similar shop gets a package sized to the job, not a stock kit: frames designed for the actual site loads under ASCE 7-22, openings placed where the work happens, and drawings that a local erector can follow piece by piece. Share the footprint, door sizes and any crane or hoist needs, and World Steel will scope the steel.
Even a small workshop needs anchor bolts set exactly where the drawings say, because a few millimeters off can stop a column going in. World Steel supplies an anchor bolt plan with every package, so the foundation contractor sets the bolts before the steel arrives.
Gallery
Mautic Workshop images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Mautic Workshop by the numbers
Steel weight
About 60 metric tons of structural steel (66 short tons), about 2% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 19th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Mautic Workshop is one of 63 warehouses in the World Steel portfolio on this site, and one of 6 projects listed for Australia.
Closest in steel weight:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Hope Valley, Western Australia, Australia
Hope Valley
Warehouse · 350 t steel
Photo
Thailand · 2020
Thaworn Warehouse
Warehouse
Photo
Philippines · 2023
Vic Ong Warehouse
Warehouse · 220 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.