- Location
- Thailand
- Building type
- Warehouse
- Year
- 2026
- Footprint
- 30 m × 100 m (98 ft × 328 ft) · about 3,000 m² (32,300 sq ft)
Project overview
About Warehouse 30×100
Warehouse 30×100 in Thailand, a 2026 project, measures 30 by 100 m, which is about 98 by 328 ft or roughly 32,000 sq ft. A building this long relative to its width is made of many identical bays, and that repetition is where factory fabrication earns its keep: the same frames, connections and secondary members are produced again and again with consistent quality.
US owners planning a long storage building, cross-dock or production line can use the same logic. Repeated frames simplify shop drawings, packing and field erection, and your erector can settle into a rhythm bay by bay. World Steel designs to IBC 2024 and ASCE 7-22 by default and provides calculations for local review. Tell us your length, width and eave height to start pricing.
At 100 m (328 ft) long, the building is likely to need a planned approach to thermal movement and wall bracing along its length. On a US warehouse of this size, the Engineer of Record decides whether an expansion joint is needed, and World Steel details the frame to suit.
Gallery
Warehouse 30×100 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 30×100 by the numbers
Footprint
About 3,000 m² (32,290 sq ft) of footprint, about 56% of a US football field with end zones.
It is 30 m (98 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.
By footprint it ranks 13th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 30×100 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 30×100 in 2026, together with 6 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2024
M&D Warehouse
Warehouse · 2,000 t steel
Photo
Thailand · 2024
Warehouse 12×24 & Warehouse 12×18
Warehouse
Photo
Thailand · 2025
Warehouse 38×135
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.