Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Coated members drying in rows on stands in the paint hall

Members drying in the World Steel paint hall in Vietnam after coating.

Indonesia

Wika Intinusa Warehouse Structural steel for a warehouse in Indonesia

A steel warehouse in Indonesia, listed in World Steel's portfolio for 2025. Built for an Indonesian industrial group, it is a typical storage building for a manufacturing campus.

Location
Indonesia
Building type
Warehouse
Year
2025
Next step Plan a similar building →

Project overview

About Wika Intinusa Warehouse

World Steel supplied the structural steel for Wika Intinusa Warehouse in Indonesia in 2025. It is one of several warehouses the company delivered to Indonesia that year, which makes it a current reference rather than an old one.

Recent export work matters to US buyers because it shows the shipping, packing and document process is in active use. For a US warehouse, each quote states the Incoterm and who acts as importer of record, and imported steel can be subject to US duties. Your contractor handles foundations and erection from our drawings. Ask for a proposal.

Indonesia sits on an active seismic belt, so even simple warehouse frames there are checked for earthquake forces. US buyers in seismic regions will find the same design questions in World Steel's work for the West Coast.

Drawn illustration of warehouse, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Wika Intinusa Warehouse by the numbers

In the portfolio

Wika Intinusa Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 3 projects listed for Indonesia.

World Steel supplied Wika Intinusa Warehouse in 2025, together with 6 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.