Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Tamada Warehouse, Myanmar in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Myanmar

Tamada Warehouse Structural steel for a warehouse in Myanmar

This 2019 project is a steel warehouse in Myanmar. It is an example of the plain, repeatable warehouse format that is simplest to fabricate and ship.

Location
Myanmar
Building type
Warehouse
Year
2019
Next step Plan a similar building →

Project overview

About Tamada Warehouse

Tamada Warehouse is a 2019 steel warehouse in Myanmar, supplied by World Steel as an export package. Shipping a building to another country means everything has to be listed, packed and marked before it leaves the factory.

US buyers ordering steel from overseas face the same reality: a missing bolt or clip is a real delay. We pack by erection sequence, include connection hardware and anchor bolt plans and send a detailed packing list with every shipment so your erector can verify contents on arrival. Each quote spells out the Incoterm and importer of record. Request a proposal.

A warehouse in Myanmar supplied in 2019. Monsoon rains there are among the heaviest in Asia, which makes roof drainage and wall flashing as important as the frame itself.

In context

Tamada Warehouse by the numbers

In the portfolio

Tamada Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 2 projects listed for Myanmar.

World Steel supplied Tamada Warehouse in 2019, together with 19 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.