Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Dat Tuan Pharmaceutical Office on site

Site photo, World Steel project archive.

Ho Chi Minh City, Vietnam

Dat Tuan Pharmaceutical Office Structural steel for a multi-storey & civil building in Vietnam

A multi-storey civil building in Ho Chi Minh City, Vietnam, listed in World Steel's portfolio for 2020. Civil buildings like this follow stricter occupancy rules than a warehouse, which is where engineering depth shows.

Location
Ho Chi Minh City, Vietnam
Building type
Multi-storey & civil building
Year
2020
Next step Plan a similar building →

Project overview

About Dat Tuan Pharmaceutical Office

World Steel engineered and fabricated the structural steel for the Dat Tuan Pharmaceutical Office in Ho Chi Minh City, Vietnam, completed in 2020. It is a multi-story civil building rather than a single-span shed, so the work covered columns, floor beams and connections stacked level over level, the same family of members a US low-rise office or medical tenant building uses.

For a US owner planning a two- to four-story office, the takeaway is that the detailing workflow already handles framed floors as well as roofs. On a US job the frame would be checked to IBC 2024, ASCE 7-22 and AISC 360, or whatever basis your Engineer of Record sets, with Tekla erection drawings your erector can follow. Send your architectural plans for an early framing study.

An office for a pharmaceutical and health equipment company in Ho Chi Minh City, framed in steel. Office buildings for regulated industries often add lab or storage space later, and a steel frame can be designed with spare floor capacity for that change.

In context

Dat Tuan Pharmaceutical Office by the numbers

In the portfolio

Dat Tuan Pharmaceutical Office is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Dat Tuan Pharmaceutical Office in 2020, together with 26 other projects shown here from that year.

More multi-storey and civil buildings:

Design points

What a multi-storey & civil building needs from its steel

General points for every multi-storey & civil building, not specific to this one.

Stacked tolerances

Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.

Learn more →

Risk category matters

Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.

Learn more →

Fire-resistance ratings

Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.

Planning a multi-storey & civil building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.