- Location
- Ho Chi Minh City, Vietnam
- Building type
- Warehouse
- Year
- 2019
Project overview
About Cat Lai Warehouse
Cat Lai Warehouse, completed in 2019, sits in Ho Chi Minh City’s Cat Lai area, known for its container port and logistics traffic. World Steel supplied the structural steel for this storage building.
US logistics developers and third-party warehouse operators will recognize the brief: wide clear spans, dock walls and a roof that handles local snow, wind and rain loads set under ASCE 7-22. We size frames to those loads, detail them in Tekla and pack the steel by erection sequence so the crew on your site unloads in order. Tell us your footprint and eave height.
Warehouses near busy ports are built close to heavy truck traffic. They need strong door frames and protection at door jambs and column bases, where trucks and forklifts are most likely to hit the steel.
In context
Cat Lai Warehouse by the numbers
In the portfolio
Cat Lai Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Cat Lai Warehouse in 2019, together with 19 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Tay Ninh Province, Vietnam · 2019
Nam Long Warehouse
Warehouse
Hoc Mon District, Vietnam · 2019
Pacific Warehouse
Warehouse
Photo
Hope Valley, Western Australia, Australia
Hope Valley
Warehouse · 350 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.