- Location
- Thailand
- Building type
- Warehouse
- Year
- 2022
- Footprint
- 19.4 m × 37 m (64 ft × 121 ft) · about 718 m² (7,700 sq ft)
Project overview
About Warehouse 19.4×37
Warehouse 19.4×37 is a 2022 project in Thailand measuring 19.4 by 37 m, roughly 64 by 121 ft and about 7,700 sq ft. The 19.4 m width shows that World Steel buildings are not limited to catalog sizes, which matters to US buyers whose lot lines, setbacks or existing structures dictate an exact footprint.
Because every building is engineered for its own dimensions and loads, an unusual width or length is handled the same way as a round one. World Steel produces calculations and drawings for your Engineer of Record to review and approve for the permit. Send the exact footprint you need and the site address to get a quote.
A 19.4 m by 37 m building shows that World Steel designs to the exact width the site and use require, not to a fixed catalog size. For US contractors working with tight setbacks, the frame can be sized to the lot.
Gallery
Warehouse 19.4×37 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 19.4×37 by the numbers
Footprint
About 718 m² (7,730 sq ft) of footprint, about 13% of a US football field with end zones.
It is 19.4 m (64 ft) wide. A width under 20 m is usually one clear span, the size of many US shops, storage sheds and small warehouses.
By footprint it ranks 25th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 19.4×37 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 19.4×37 in 2022, together with 12 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2026
Warehouse 30×100
Warehouse
Photo
Thailand · 2025
Warehouse 38×135
Warehouse
Photo
Thailand · 2020
HDD Warehouse
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.