- Location
- Thailand
- Building type
- Multi-storey & civil building
- Year
- 2020
Project overview
About Phuket House
Phuket House is a multi-story building in Thailand completed in 2020, with World Steel providing structural steel design, fabrication and supply. Multi-story steel work involves columns, floor beams and bracing that must align floor after floor, and connection details that a site crew can bolt up at height with confidence and without rework.
US developers of small hotels, offices and mixed-use buildings increasingly consider structural steel for its speed of framing and long floor spans. Our team designs such frames to AISC 360 within IBC 2024 and ASCE 7-22, coordinates with your architect through IFC models and provides erection drawings for your steel erector. Send architectural plans for a framing proposal.
Phuket is a resort island on the Andaman Sea, with salt air, heavy monsoon rain and strong seasonal winds. Coastal steel is coated for that exposure, as it is in Hawaii, Florida and the Carolinas.
Gallery
Phuket House images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Phuket House by the numbers
In the portfolio
Phuket House is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Phuket House in 2020, together with 26 other projects shown here from that year.
More multi-storey and civil buildings:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
3D model
Western Australia, Australia · 2023
Byford Child Care
Multi-storey & civil building · 60 t steel
Photo
Tay Ninh Province, Vietnam · 2023
World Steel Group Office, Tay Ninh
Multi-storey & civil building
Photo
Kalgoorlie-Boulder, Western Australia, Australia
Goldfields Arts Centre
Multi-storey & civil building · 400 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.