- Location
- Singapore
- Building type
- Steel bridge
- Year
- 2025
Project overview
About Foot Bridge
This pedestrian bridge in Singapore was fabricated by World Steel in 2025, one of its most recent specialty projects. A footbridge is exposed on every side, so member layout, weld quality and finish are all on view.
Universities, corporate campuses, parks and industrial plants in the US commission similar walkways and elevated links. Pedestrian loads, vibration limits and the code basis are set by your Engineer of Record. We fabricate to those drawings, trial-fit where practical and ship the spans in pieces sized for transport and lifting by your erector. Contact us with your concept.
Footbridges are designed for vibration as much as for strength: people notice a bridge that bounces. The frame stiffness is checked against walking frequencies, the same check a US Engineer of Record asks for on a campus or park bridge.
Gallery
Foot Bridge images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Foot Bridge by the numbers
In the portfolio
Foot Bridge is one of 3 steel bridges in the World Steel portfolio on this site, and one of 3 projects listed for Singapore.
World Steel supplied Foot Bridge in 2025, together with 6 other projects shown here from that year.
More steel bridges:
Design points
What a steel bridge needs from its steel
General points for every steel bridge, not specific to this one.
Weld inspection
Bridge welds see repeated live loads, so inspection is more rigorous than for building welds.
Learn more →Shop fit-up checks
Splices are checked in the factory so the bridge assembles in the field without reaming or rework.
Learn more →Protection for the crossing
Bridges over streams, rivers or salted roads get galvanizing or a coating system matched to the exposure.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Steel bridge. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Singapore · 2020
Steel Bridge
Steel bridge
Photo
Tay Ninh Province, Vietnam · 2023
CFG Long An Bridge
Steel bridge · 196 t steel
Photo
Singapore · 2025
PSA Port
Port facility
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a steel bridge in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.