- Location
- Ho Chi Minh City, Vietnam
- Building type
- Multi-storey & civil building
- Year
- 2020
Project overview
About The Sun Tower
The Sun Tower is a 2020 multi-story building in Ho Chi Minh City, where World Steel carried out steel structure design, fabrication and supply. Together with Southgate Tower in the same city and year, it shows the company handling multi-level urban buildings, a class of work with stricter tolerances and coordination than a typical warehouse.
In the US, steel often frames the upper floors, roofs or podium elements of mid-rise buildings. If your project needs a steel package of that kind, we can design members and connections to AISC 360, coordinate with concrete or other systems through IFC models, and issue piece-marked erection drawings. Send drawings and your Engineer of Record’s criteria to start.
Multi-storey steel framing goes up faster than poured concrete when each floor's beams and columns arrive marked and ready to bolt. For a US mid-rise, the connection design is agreed early with the Engineer of Record so the shop drawings can be checked floor by floor.
Gallery
The Sun Tower images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
The Sun Tower by the numbers
In the portfolio
The Sun Tower is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied The Sun Tower in 2020, together with 26 other projects shown here from that year.
More multi-storey and civil buildings:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Tay Ninh Province, Vietnam · 2023
World Steel Group Office, Tay Ninh
Multi-storey & civil building
Photo
Ho Chi Minh City, Vietnam · 2020
Southgate Tower
Multi-storey & civil building
Photo
Vietnam · 2022
Hai Trung Furniture Showroom and Model House Center
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.