Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Honda Warehouse, Philippines on site

Site photo, World Steel project archive.

Philippines

Honda Warehouse Structural steel for a warehouse in Philippines

This 2024 project is a steel warehouse in the Philippines. It is an example of the plain, repeatable warehouse format that is simplest to fabricate and ship.

Location
Philippines
Building type
Warehouse
Year
2024
Next step Plan a similar building →

Project overview

About Honda Warehouse

Honda Warehouse is a 2024 pre-engineered steel warehouse in the Philippines with structural steel from World Steel. It is one of a steady run of warehouse projects the company has shipped to that country.

For US buyers, the warehouse is a familiar type: a clear-span frame, purlins and girts, bracing and wall openings for doors. What a reference like this shows is a supplier with a repeatable package. We confirm your loads under ASCE 7-22, propose value-engineering options for your Engineer of Record and ship the kit sorted by erection order. Get in touch.

Warehouses for global automotive brands are built to the owner's own standards on top of local codes, with strict documentation and inspection. Large US owners often do the same, and World Steel's quality records are prepared for that level of review.

In context

Honda Warehouse by the numbers

In the portfolio

Honda Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 8 projects listed for Philippines.

World Steel supplied Honda Warehouse in 2024, together with 16 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.